power | 75kw(main motor) |
5.5kw BLY27-35(gearbox) | |
3.0kw BLY18-17(gearbox) | |
Cake thickness | 15-20mm |
Cake residual | 13%-16%(pre-pressing) |
5%-7%(squeezing) | |
dimension | 3800*2320*3800(mm) |
weight | 8500kg |
capacity | 90T-180T/D |
♦ Our products have the high quality and high performance.we use the stainless steel instead of the carb
on steel.
♦ our welding worker should get the certificates.and our electric machines all imported from Germany.
Product Display
High-quality groundnut→Cleaning→Crushing →Flaking→Cooking
→ Pressing → Settlement → Crude oil
↓ ↑
Pre-pressed cake→ Secondary pressing→Extraction plant ♦ Cleaning device:remove the raw material peanut in various impurities, such as: iron, stones, clump, such as the plant leaf, clean up till impurity content does not exceed 0.2%. Use vibration cleaning sieve and magnetic selector to get better cleaning effect. And This step is mainly to clean the big impurities ,like the stone , big dust , iron etc .
♦ Crushing machine: his Process is mainly to crush the peanut , as the peanut is big ,it is not easy to press .We must crush the peanut to 6-8 pieces .Then we need to peel . The rate of peel is about 90% . In order to meet the requirements of crushing, the peanut is suitable for crushing with the moisture of 7% to12%.
♦ Softening process:the purpose of softening is to adjust the moisture and temperature of oil, and make it soft.
♦ Flaking process: rolling raw material into flakes, and the purpose is to increase surface area, destroy the peanut cell tissue, shorten the way of oil out from cake.After crush and peel ,we need to flake the crushed peanut , which make the cell wall of peanut broken . And we flake the peanut to 0.55 mm thickness .Then it is useful for the oil extracting
♦ Cooking process: use steam cooking, inject direct steam and cook the flakes to meet the requirementof oil press.
♦ Prepress: press the flakes to leave about 16%-18% in the cake. The cake will go to extraction process.More products
Customer Brand
Company Information
Packaging & Shipping
Packing Details : International standard package
Delivery Details : 7-10days after receivethe deposit.
Certificate
Patents and centifications
Our company has the professional design team. Our products have passed the authentication of Quality system ISO9001, and SGS, CE certifications. All of our products accord with machinery industrial standard of China.
And our products have passed the authentication of Quality system ISO9001, and SGS, CE certifications.All of our products accord with machinery industrial standard of China.
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: what is the material of the machine
A: carbon steel and stainless steel, customized.
Q: How long is your delivery time?
A: Generally it is 3-5 days if the goods are in stock. or it is 7-10 days if the goods are not in stock, it is according to quantity.
Q: What about the quality warranty?
A: We offer one -year quality warranty for the equipment under the right control of the workers