ASTM A333 Salable Complete production line carbon steel pipe standard length
Product Description
Product name | Carbon steel pipes |
Standard |
ASTM A333/ ASME SA333 |
Description | Seamless carbon steel pipe for high temperature service |
Specifications | O.D.: 6.0∼1200mm: Hot Rolled, Cold Drawn & Cold Rolled |
Mechanical Properties:
Standard |
Grade |
Tensile Strength (MPa) |
Yield Point (MPa) |
Elongation (%) |
|
Y |
X |
||||
ASTM A333 |
Grade 1 |
≥380 |
≥205 |
≥35 |
≥25 |
Grade 3 |
≥450 |
≥240 |
≥30 |
≥20 |
|
Grade 4 |
≥415 |
≥240 |
≥30 |
≥16.5 |
|
Grade 6 |
≥415 |
≥240 |
≥30 |
≥16.5 |
|
Grade 7 |
≥450 |
≥240 |
≥30 |
≥22 |
|
Grade 8 |
≥690 |
≥515 |
≥22 |
|
|
Grade 9 |
≥435 |
≥315 |
≥28 |
|
|
Grade 10 |
≥550 |
≥450 |
≥22 |
|
|
Grade 11 |
≥450 |
≥240 |
≥18 |
Strike Temperature Condition:
Crade |
The lowest temperature for strike test |
|
℉ |
℃ |
|
Grade 1 |
-50 |
-45 |
Grade 3 |
-150 |
-100 |
Grade 4 |
-150 |
-100 |
Grade 6 |
-50 |
-45 |
Grade 7 |
-100 |
-75 |
Grade 8 |
-320 |
-195 |
Grade 9 |
-100 |
-75 |
Grade 10 |
-75 |
-60 |
other product Company Information Certificates factory show Packaging & Shipping Our Services FAQ
1. How long will it take to produce an order?
It will take 30-90 days which depends on the quantity of the order.
2. What is your minimum order?
MOQ for each size is 5 tons, but if the total quantity is large, the MOQ can be less.
3. What form of quotation do you offer?
FOB Shanghai,Tianjin/(China), CIF and CNF Your destination, FCA mill location, EXW etc.
4. What is your payment term?
30% down payment, 70% before shipment or against B/L. 100% L/C at sight or 100% L/C at 30 days. We accept US Dollar, Euro, GBP etc.
5. Does the sample for free or not?
The samples are not free, you need to pay freight cost.
6. How do you guarantee the quality of the products?
All of our procedures are strictly operated under the ISO 9001, and all the pipes we strictly follow the standard to produce. Also we have our own test centers, every tubes/pipes will be tested before shipmemt.
7. How do you to package the product?
We usually pack pipes in bundles not bigger than 6 inches, over 6 inches all the pipes no packages.
8.How about the Third Party Inspection ?
We have been working with DNV,TUV,SGS,BV,CO,IEIetc;