High yield nut algae oil extraction press equipment
1. Technical Process Introduction (with rice bran , for example)
2. Picture of the equipments
2.1 Pretreatment
Extraction
Refining
High quality plant oil
3. Construction Period
- Within 15 days after the contract comes into effect, all the workshop process design should be done.
- Equipment purchasing and production: 70 days after the contract comes into effect, equipment purchasing and production should be done.
- Installation: All the engineering installation should be completed within 40 days after construction completion.
- Pressure test, anticorrosion and heat preservation: 20 days (along with the construction)
- Engineering commissioning: 20 days.
- Considering the crossover of construction and project period, the total project period is about:130 days.
4. CE certification (safe certification) and BV certification.(quality certification)
CE ( conformity with European (demand)) , safe certification in European Union. We promise our equipment is fully safe in production.
BV means : Bureau Veritas . The most prestigious quality certification organizations.
We promise we will provide high quality equipment.