Nik Naks Extruder Machine, Fried Kurkure Making Machine
a. Raw materials adopts corn grits as raw materials meanwhile mixing with water and oil
b. Products Cheetos, kurkure, nik naks and corn curls
c. Capacity 100--150kg/h
d. Flow chart
Mixing system---Extrusion system----Baking system (Frying System) ---Flavoring system----Packing system
e. Voltage in China Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries
f. Technical Parameter
Model | Installed power | Real power | Output | Dimension |
SP76 | 96 | 62kw | 120-150kg/h | 17000x1100x2500mm |
Finished Products
Reference Kurkure/ Nik Naks Bags Size
Kurkure snacks flow chart
Kurkure/ nik naks machine are manufactured by blending corn and water. It’s very popular in South Africa and India.
The mixture is heated under pressure, and then extruded through a die. The texture of the snack
is formed as a result of contact with hot air, causing steam in the mixture to expand and creating
its characteristic texture.
After drying or frying, the product is then tumbled with the desired flavor components, other flavor
and format variations such as Cheetos Puffs, Cheetos Paws, Cheetos Twists, Cheetos Balls, and
Cheetos Nik Naks Extruder Machine, Fried Kurkure Making Machinels are all finished with a drying stage in large ovens.
SP-76 Rotary Head Extruder for Kurkure/ Nik Naks Snacks
Customers and us
High Reputation Among Our Customers
a. Customers’ visiting
b. Installation & commissioning in customer’s factory
c. Reference customer list
Packaging & Shipping
Stretch film packing
Fumigation-free wooden case packing
Company News
We attended many domestic and international exhibitions in 2014
FAQ1). The size of a suitable warehouse for the kurkure/nik naks snacks production line
Normally, according to our experience, a space with 20×3×3M is enough for our whole production line. But consideration of raw material and final production warehouse, dressing room, pre-mix preparation room etc. You can design it according to your requirement.
2). Operator Needed: 2-4 Normally, one manager, two operator and one technician
3). Power Consumption: 62kw
4). Guarantee time: one year
5). We provide Turnkey Project
a. Provide factory layout according to your factory size in advance.
b. Provide the recipe when your esteemed company cooperate with us.
c. Before place the order, we invite you to visit us and make demonstration for you in workshop
d. Before delivery the machines, we invite you to inspect all the machines.
e. Installation and commissioning in your factory for 15days
6). Payment terms: 30% T/T as down payment, 70% by irrevocable L/C at sight or T/T before delivering
7). Delivery time: 40 days after receipt the deposit